Ⅰ. Project content
Covering an area of 245 mu, it will build a demonstration production line project of rocket core component storage tank and rocket assembly, which includes rocket core component R&D center, core component production line, rocket storage tank production line, rocket assembly production line, etc., as well as supporting test center and trial assembly center.
Ⅱ. Investment estimation and capital source
The project investment is more than 3.6 billion yuan, and the fund is raised by the enterprise itself.
Ⅲ. Market analysis
The development of commercial aerospace must gradually move from the original aerospace components to industrial COTS components, and reduce costs on the basis of ensuring stability. This also requires the cooperation and common development of private commercial aerospace enterprises.
The manufacturing technology of the whole bottom zero main weld can help to manufacture the rocket structure with high quality, low cost and short cycle. The zero main weld at the bottom of the tank can greatly improve the pressure bearing capacity of the tank, reduce the failure risk and manufacturing cost of the tank bottom, and reduce the weight of the tank bottom by more than 5%. In addition, the whole bottom manufacturing process can be greatly optimized. The processing process is optimized from the original 23 to 9, the cycle is reduced by more than 30%, the tooling input cost is reduced by about 35%, and the equipment man-hour cost is reduced by about 40%.
Ⅳ. Economic benefit analysis
After completion, it can supply 20-30 rocket core components annually. It is expected to achieve an annual output value of 10 billion yuan within three years.
Ⅴ. Construction conditions
As the downtown area of Tangshan, Lunan District, relying on the Chengnan Economic Development Zone, focuses on strategic emerging industries, and focuses on introducing aerospace, modern emergency and intelligent manufacturing industries. Chengnan Economic Development Zone (provincial development zone) has greatly improved the project carrying capacity. The project land has been completed with seven connections and one leveling. The surrounding upstream and downstream industries have a good foundation and supporting facilities are complete. At the same time, we will increase support for key industries and provide guarantee for project implementation from multiple dimensions such as services, supporting facilities and policies.
Ⅵ. Cooperation mode
Sole proprietorship and joint venture
Ⅶ. Contact information
Lunan District Bureau of Commerce and Investment Promotion
Tel: 0315-2205172